Do not choose pavement flooring easily

Whether it is paving solid wood flooring or composite flooring, try not to put it on a rainy day. Because the air is wet on rainy days, the ground is damp, the water evaporates slowly, and the glue dries slowly. In this case, paving the wooden floor will easily cause deformation or hollowing in the future. Especially on the first floor, there will be wet phenomenon. . In the cloudy days where the air humidity is not very high, it is possible to lay wood floors, but it is very important to check the moisture content of the floor. Generally, the laminate flooring and parquet can meet the requirements, while the solid wood and bamboo flooring must be checked, otherwise it will be winter. , Indoor drying and heating, the floor will appear too large gap phenomenon.

After passing the inspection, be sure to put the floor in the original packaging and wrap it in plastic sheeting, otherwise the floor will absorb the humidity in the indoor air and deform. When paving a wooden floor on a cloudy day, the owner should pay attention to reminding the decorator to make the paving compact. Otherwise, once the sky is clear and the water is evaporated, the wooden floor will shrink and the gap between the floors will increase.
At the same time, attention should also be paid to the following points: The base level must be flat, dry, and pest control powder should be sprinkled on the ground before construction, and then a layer of moisture-proof cloth should be laid on it; the beveled keel must be dry, and the moisture content is equal to or less than 15%. Keel or splint (plywood should be sawed into no more than 600 × 600mm specifications, between the splint should have a gap of 5 ~ 10mm) plus a layer of moisture-proof cloth to achieve double protection, to prevent moisture infiltration. 18mm thick floor is the best choice; Paving, the floor and the surrounding walls spaced 8-10cm or so of the reserved seam, the interface between the floor can be used special waterproof floor glue or straight nails fixed. All floor panels shall be longitudinally dislocated, and shall be paved. It is recommended that after each panel is spliced, tap wood and wooden strips to make each panel's male and female's jaws close together. The glue should overflow the interface and be half dry. Gently shovel away any excess glue that has leaked. If the amount of glue is insufficient, it will not overflow the surface, and there may be sequelae such as cracks, unsealed interfaces, and insufficient moisture resistance in the future.

Flooring interior decoration heating

900 TVL

YCX Electronics Co., Ltd. , http://www.sz-camera.com