Floor heating installation acceptance process

In addition to professionals, I believe that the vast majority of owners do not know how to install the ground warmer, but also mention the acceptance work, and its experimental income is not as complicated as everyone thinks, the following are some of the major links.

There are many products involved in floor heating. In particular, some products are hidden under the concrete and can be particularly carefully checked.

Material acceptance

Inspect whether there is any error in the distribution of the floor heating in the drawings. The materials can be checked against the list for acceptance. The main point is to see if the material is missing, and verify the brand and origin, to avoid the possibility of the material being sent to the wrong due to negligence. Heaters will also send supervision to the site. .

In the case of bulk water collectors, if there is a missing part, the assembly process will be delayed.

The coils sent by the heating company are now basically a single circuit.

2. Construction acceptance

Floor heating is usually divided into two phases: pre-construction and later installation and commissioning. The construction phase can be completed within 1-2 days, including the laying of pipelines and the installation of water collectors, while the installation of heating furnaces and the commissioning of the systems are carried out until the later stages of renovation. The acceptance here is mainly for the pre-construction.

Check the corner insulation, which is the most easily lost heat.

The coil spacing is the same as the drawing, usually 20 or 16 centimeters.

After the floor heating is completed, it is necessary to use a pressure gauge to suppress and seal the pipe.

Unlike a single product, floor heating is a system and its stability is important.

3. System acceptance

The acceptance here can also be understood as commissioning. In the system commissioning, the supervisor will also record the parameters for future after-sales service. If the owner does not understand the system, he can consult in time, such as the intelligence of some thermostats. Programming settings and more.

During the acceptance process, engineers found problems with line connections and adjusted them.

Check the tightness of the pipe connections of the equipment and ensure the tightness.

The acceptance of the temperature controller in the acceptance of the owner is consistent with the design drawings.

Construction acceptance decoration design layout

Reflective Pendant Gift

Unlike the general pendant,Reflective Pendant is made by Reflective Material .Thus,reflective pendant can be noticed in dark place.In the day time,reflective pendant is a simple pretty adornments you can hang both on your bag and clothes.In the evening,reflective pendant make you visible in the dark.Reflective pendant can be a small gift to increase safe.

Description of Reflective Pendant Gift

Size: customized size

Material:PVC

Color:customized

Shape:animal or custom

Measure: customized

Usage:outdoor activity,decoration bag or cloth,etc.

Item:reflective gift

Packaging:standard export package or customized

Reflective Tape:high visible

Payment:L/C,T/T,Western Union

Delivery:Ningbo,Shanghai,7-15 days according to the quantity

Reflective Pendant Gift

FAQ:

Q:How long could I get a sample? Sample cost?

A:Usually 2-5days.Simple sample can be free after you pay for the freight cost.

 

Q:What`s you delivery time?

A:15-20days.

 

Q:Can the logo or company name printed on the products?

A:Yes, any logo or design is available. We accept OEM.



Reflective Pendant Gift

Reflective Pendant Gift,Reflective Keychain,Reflective Safety Pendant,Safety Reflective Pendant

Yongkang Juyuan Reflective Products Factory , http://www.pjreflect.com