Home improvement Cheats: Blocking Overpriced Black Holes

The renovation of the budget seems to have been a common "pain" for the owners. However, if you do a budget to do a good job, you can largely avoid the phenomenon of “increasing items” in the decoration. Experts said that in order to ensure the accuracy of the budget, in addition to the accurate measurement of various data, the amount of housing should also be investigated in detail on the site's water circuits and grassroots processing.


Pigeon brand paint coating native tree solid wood furniture

Budget more accurate

On the one hand, the measurement room measures the length and width of walls, floors, and water circuits. On the other hand, it surveys the original water circuit, wall tops, floors, and the grass-roots level of kitchens and toilets to determine the water. Circuits and grass-roots renovation projects and quantities. The inaccuracy of the volume room will lead to the modification of the design due to the wrong size during the construction, the increase of the construction project, or the inability to install the sanitary ware, heating, etc., which will result in increased expenditure. Now, most of the landlord's budget bills are made before the quantity of houses. It is not surprising that the “overspending” phenomenon occurred later. If the owner wants to make a more accurate estimate of the basic decoration, the amount of room is a key step.

Accurate data measurement

The first step is to measure the height, width, height, thickness of the wall and beam, the height of the doors and windows, and the height of the wall of each room wall. These data are related to the number of wall surface and floor surface works. In this step, the owner can record the measured data and review the designer's data marked on the map to ensure the accuracy of the on-site data and facilitate the future supervision of the project. What needs to be reminded is that in calculating the area of ​​the wall surface, the area of ​​the openings, window holes, and cornices on the walls needs to be removed. Many guerrillas will “ignore” this when quoting, and the area of ​​paint may be poor. A lot of it.

Location marking should be clear

In addition, whether or not the positioning is clear also affects the future whether it is overspending. Designers should look at various pipes, heating, gas, floor drains, and power boxes, and mark specific locations, including the position after the water pipes are installed, the wall distance from the toilet, the specific location of the floor drain, and the length and width of the heater. . If the location of the sewer pipe or the gas is not measured correctly, the sanitary ware, water basin, kitchen appliances, cabinets, etc., are likely to be replaced due to unreasonable or improperly designed dimensions. The installation method of air conditioners and the location of air-conditioning eyes need to be set well to avoid changing the shape of the TV background wall due to improper settings, thereby increasing the subsequent expenditure.

Hydro-electricity reconstruction should be carefully investigated

Often owners complain that the total price of hydropower reform exceeds expectations. However, if you carefully measure the room and the owner is prepared for it, there will not be too much change in the later period to avoid unnecessary spending.

The amount of room to conduct a thorough investigation of the original water circuit material. If the water pipe is a galvanized pipe that is prone to heavy metal pollution or an iron pipe that is prone to aging and rusting, the circuit is an aluminum wire or a copper wire with a low circuit load. In order to ensure future safety, it is recommended that all be replaced. In addition, it is also necessary to check whether the circuit phase is accurate, whether the original line is piped, whether the leakage protection is normal, and whether the original circuit is leaking. If there is a problem, it needs to be modified to ensure the safety of electricity.

The owner must fully communicate with the designer when he or she measures the room, sketch the functional partition and layout of the room, plan the position and size of the furniture, and the position of the outlet switch. In this way, when determining the location and number of switches and sockets, the owners will have a “spectrum” in mind.

The transformation of the water circuit is very professional, and if you can escort with professionals, of course, the best results. At present, some companies use the labels of the power switch and the weak switch when marking the water circuit. The wires and the length of the water path are marked by the identification line. The owner can learn from this measurement method.

Do not underestimate grassroots treatment

The primary treatment of the primary wall is directly related to the later construction projects and construction quality. Some of the original wall surface treatment is not in place, such as putty handling is not a good direct tiling, it is easy to cause empty tiles; kitchen wall coating is not handled well, later need to eradicate the original putty to re-grow, or easily cause a large area of ​​empty tiles; The unevenness of the wall or the non-straight angle of the yin and yang will affect the appearance, and it will also make installation of furniture, cabinets, etc. difficult. Once the grassroots has problems and needs to be dealt with, the budget will increase, so it should not be overlooked when measuring the amount of housing.

The items to be surveyed include: measuring the levelness of the ground and the verticality of the wall; checking whether the original wall surface is water-resistant putty, if it is not water-resistant putty must be eradicated; if it is an old house, need to check whether the original wall surface is a sand wall, sand Gray wall must be removed after doing grassroots processing; measuring Yin and Yang angle is square; check the toilet, the kitchen is grass-roots level is empty, the original wall surface is not standard.
Links: Comprehensive acceptance issues, the case site will teach you to follow the "three principles"

Construction Acceptance Villa Design Concealed Decoration Switch Decoration Design Heating Furniture Lacquer Door Kitchen Cabinet Door Toilet Design Toilet Door Size Bathroom Tile Bathroom Size Toilet Door Tile Tile Wall Kitchen Tile Wall Tile LD Tile

Magnetic Assembly & Device

Holding/Retrieving Magnet,Magnetic Tool Holder,Pot Magnet,Lifting Magnets

Magtoon Magnetic Products Co., Ltd. , http://www.dg-magnets.com