90 square meters, two rooms, one hall, one bathroom decoration budget detailed explanation

The 90-bedroom, 2-bedroom, 1-bathroom house does not need to cost too much in the decoration process. 30,000 yuan can complete a simple decoration. Let ’s take a look at how to decorate 90 house with 30,000 yuan. , To understand the 90 decoration budget.

Picture  

First, wall base treatment

It is estimated that it is 3 yuan per square meter. The wall is made up after wiring, the gap treatment of the wall, the elastic putty of the insulation layer gap, the repair of the building through the door hole, the overall hanging cloth for the special need position is indeed good, and the silk cloth is better.

Second, paint the walls

Wall lining plus high-grade paint, 27 yuan per square meter; 821 putty plus ordinary paint, 18 yuan per square meter. If you use primer mode, you can use 821 putty powder. If not, then try not to use 821 putty, because 821 putty powder is prone to blistering and large particles. The wall size is generally multiplied by the floor area multiplied by 3.5 as the wall area, but generally there will be more, so it is sufficient to multiply by 3.2, but in order to accurately deal with the situation on site.

Picture

Third, the floor tile is about 95 yuan per square meter

The cost of the combined part: {including skirting, 600 * 600 Pu Neng Seiko glass brick, if you want to choose some well-known brands I am afraid it will be more expensive. The auxiliary materials are 325.5 ordinary cement, white cement, medium sand, 108 glue, jointing agent. Because the brick cutting and damage will occur, the floor tile area should be increased by 3%-8%.

Fourth, the use of laminate flooring is about 85 yuan per square meter

If you want to level with the living room floor, you can use self-leveling cement or Dibao, about 10 yuan per square meter, the total price of 95 yuan per square meter. Floor damages increase by 8%-10%.

Fifth, kitchen and bathroom wall tiles are about 75 yuan per square meter

The damage report can be the same as the ground (all kinds of ceramic tiles for the wall surface need 11kg of common cement per square meter, 33kg of medium sand, and 2kg of lime paste. 13kg of ordinary cement for mounting all kinds of ceramic tiles on the column surface , Medium sand 27kg, lime paste 3kg.) The selection method can refer to the way of floor tiles.

Sixth, toilet equipment is about 2,500 yuan per set

Toilet, wash basin, faucet, bath set, mirror, paper box, soap box, towel bar, tray, floor drain, Yuba.

The bathroom is guaranteed to be 85 yuan per meter; the combination material of the hand basin and bathroom cabinet is divided into two types: A. oak solid wood bathroom cabinet, plus hand basin, faucet, etc. The estimated cost is about 1200 yuan; B. PVC board plus hand basin, faucet The estimated cost is about 1,000 yuan. The Acrylic bathtub is estimated at 1,000 yuan, and the overall glass bath is estimated at 3,500 yuan.

Seventh, kitchen cabinets are about 950 yuan per meter

A better configuration plan is: overall dew-loading plate, artificial marble countertop, under-counter lining board, crystal corner, double edge banding, ordinary stainless steel double basin, porcelain core copper faucet.

Eighth, suspended ceiling

The thickness of the aluminum gusset plate is 85 yuan per square meter, and the side bar is 10 yuan per meter (less than 1 meter is calculated as 1 meter). The reported loss is about 10%. If the area is suitable, it will be more economical;

Ninth, balcony wall tiles 60 yuan per square meter

Make insulation layer for the lower board of the balcony, wooden keel frame, lined with insulation board, 12MM gypsum board cover; the cost of brushing paint or tiling on the wall is 80 yuan per square meter. It is best not to use rubber bullies on the balcony wall, which is easy to fall off if it is not environmentally friendly. Mrs. Qiao's balcony clothes hanger costs 230 yuan per set, and the installer charges 10 yuan each for a total price of 240 yuan. Remember to ask for the warranty certificate, because these things are guaranteed by the manufacturer.

Tenth, indoor doors

Composite solid wood, about 1100 yuan per set, including door cover, Baile door lock, thickened hinge, door suction; paint-free door, about 950 yuan per set, including door cover, Baile door lock, thickened hinge , Door suction; solid wood doors, each set is about 1600 yuan.

Eleventh, bathroom waterproofing is 65 yuan per square meter

Check the original ground waterproof situation when entering the house, use new (environmental protection) ethylene acid emulsion paint and polyurethane waterproof coating; when the ground foundation is flat, carry out the construction, every 2 ~ 6 hours, a total of 3 times; 24 hours waterproof test No leakage, protective layer of cement mortar.

Twelfth, power transformation

Unit price for concrete wall excavation: 30 yuan / m; unit price for brick wall excavation: 25 yuan / m; unit price for light body wall excavation: 22 yuan / m. Material and process: 1 ordinary PVC wire pipe wiring, without panel (less than 1 meter is calculated as 1 meter); 2 wiring 2.5 square plastic copper wire, air conditioning 4 square plastic copper wire; 3 sheathing wire can be used if it is not allowed to bury the pipe .

Thirteenth, waterway reconstruction

Unit price of slotted galvanized pipe: 35 yuan / m; unit price of unslotted galvanized pipe: 30 yuan / m; unit price of grooved PPR pipe for concrete wall drilling and slotting unit price: 30 yuan / m; unit price of 25 mm / m for brick wall .

Fourteenth, circuit installation

Electrical control box, switch box, socket, safety protection switch. Five-eye single socket, three-eye single socket, double socket, air conditioner socket, socket board.

Fifteenth, lamps

Mirror headlights, living room headlights, bedroom lights, etc., generally small and medium-sized companies do not charge installation fees, because this part of the money is already in the power transformation, about 3,000 yuan.

Sixteenth, garbage cleanup

200 yuan for the removal of garbage. Many people have mentioned this problem. The general decoration company does not control the removal of garbage. If it is not just placed outside the door, there is no need to give it. The decoration company must take it away. Things like finding a car are troublesome, and the decoration company is too easy. The cleaning fee is 200 yuan. Many decoration companies will now contact some of them for sanitation. The price ranges from 150-300 yuan. The cleaning is good. It is much easier for the owner to clean it by himself.

Seventeenth, management fee 1500 yuan

The general decoration company only writes the general daily management on the management fee. This is a very vague statement. It is necessary to indicate in the contract what kind of detailed management there is. If they can't do it, they will be deducted.

The decoration budget of 90 square meters, two rooms, one hall and one bathroom is introduced here. The above content is for your reference for decoration, and I hope it will be helpful to everyone.

Editor in charge: GO Jiaju

Laser Cutting Parts

Laser Cutting Parts,Metal Fabrication Laser Cutting Parts,Steel Laser Cutting Plates,Metal Laser Cutting

JIANGSU TONGDE INTERNATIONAL TRADE CO.LTD. , https://www.tongdetrade.com