Six tips for winter decoration supervision

If you are decorating your home, there must be some special attention when you supervise the work. In the past, the selection of guerrillas to decorate and supervise the work of more than the content, not only includes the quality of construction, but also to prevent the other party cut corners. Most people nowadays choose a professional decoration company. Therefore, some contracts explicitly require no attention. What are the places that winter must pay special attention to?


Hongxing Real Wood Flooring Macro Real Wood Flooring

First, look at the image of the workers, the overall construction environment, and whether the materials are placed in an orderly manner. Each season decoration has its own advantages and disadvantages. In the winter decoration, it is necessary to use some mature technology to avoid the adverse consequences caused by the winter decoration.

Second, urge workers to open windows and change air. If the owner goes to the site for inspection, it is better to open the window and ventilate as much as possible to complete the air exchange when the outdoor temperature is relatively suitable and the wind is not strong. If on-site construction workers are not ventilating their windows during the entire construction process because of fear of cold, they will certainly have a bad influence on the future of indoor air.

For projects that have already started construction or have just been completed, protection should be carried out. For example, if wood production projects are completed, it is necessary to use brushing primers for protection, so as to maximize the protection of wood moisture will not be lost. For walls that have been puttyed, it is best not to open doors and windows to avoid freezing or excessive drying. For those pavement tiles, it must not be possible to freeze ice at night.

Third, make up for the price of decoration repair. The owner always thinks that the quoted price is high, so he will desperately press down the price, but there is a degree to grasp. Once the pressure on the construction unit can not afford and very much want to take orders to make money, only rely on cutting corners to solve the problem, and ultimately the victim is the victim of losses. Some of the more important concealed projects in the project leave many owners in no way. The price of the hidden project is generally determined by the owner and the decoration company according to the specific conditions of the construction. After construction, the principle of multiple return and less compensation can be implemented.

Fourth, use dry wood. Some materials in this season's renovation will naturally dry slowly, which will cause the overall construction progress to be slower, and winter construction will generally be about 10 days longer than summer. Owners do not rush and do not urge construction workers to go down when “supervising workers”.

Most of the wood that the decoration company chooses from the market is dry and dry. Generally, the wood is pulled to the construction site for 3 to 5 days for on-site drying, and the wood can be used until it is completely dry. Wall tiles and floor tiles should also be transferred from outdoor to indoor for 24 hours, and the room temperature should be adjusted before paving.

Fifth, the insulation on the wall is indeed good to prevent cracking. After the winter renovation, the walls of insulation walls and walls are easily cracked. Always open the windows for ventilation. Do not open the windows too early. Better than 9, 10 o'clock. In addition, before the foundation treatment, it is possible to paste a good cloth on the insulation wall, and then scrape the putty on the Dacron cloth until it is dry and sand it with sandpaper, which can make the heat insulation wall less susceptible to cracking.

Sixth, to leave a gap for woodworking. General decoration for some time, especially in the season after the decoration of the wall and the wood door frame at the junction there will be cracks, decoration can play glass glue, because glass glue has a strong elasticity, not easy to crack. When laying out the floor during winter construction, care should be taken to leave a proper gap. For example, when laying solid wood floors, about 2 mm of expansion joints can be left, otherwise it will cause druming and dangling.

Links: The Seven Details of Stair Design Needs Attention

Decoration Trickling Stealth Project Entrance Decoration Window Interior Decoration Decoration Company Glass Floor Tile Glass Tile Glass Door Glass

Lock Washers

China Lock Washers Suppliers

Washer, machine component that is used in conjunction with a screw fastener such as a Bolt and nut and that usually serves either to keep the screw from loosening or to distribute the load from the nut or bolt head over a larger area. For load distribution, thin flat rings of soft steel are usual.

Lock Washers,Spring Washer,Flat Washers,Grade A Washers,Bonded Seal Washers

Suzhou Gubao Screws Co.,Ltd. , https://www.gbscrewes.com