Heavy hammer level gauge maintenance and maintenance instructions

The heavy hammer level gauge measures the high frequency, and the steel cable is worn and the steel wire breaks. In the case of steel cable breakage accidents, the probability of occurrence in the fixed part of the steel cable is relatively high, and regular inspection is carried out according to the measurement frequency.
When the wire bobbin and the pulley and the detection lever of the heavy hammer type gauge are frequently used, a large amount of dust adheres, and solidification occurs after absorbing moisture, which may cause malfunction. Therefore, it is necessary to carry out regular cleaning operations on dust. The cleaning of the mechanical part must be carried out while confirming that the heavy-weight level gauge and the rear casing are removed, and visually confirm that the pulley and the detection lever are in the normal starting position. For the cable, the detection lever, and the check point of the pulley, the tensile strength of the cable is above 80N, so the measurement under normal conditions will not cause the scene of the cable to be broken. However, if the time for setting the automatic test is not correct, the high-frequency measurement of the weight level gauge will be caused, and the wire will be worn and the wire will break. In the case of steel cable breakage accidents, the probability of occurrence in the fixed part of the steel cable is relatively high, and regular inspection is carried out according to the measurement frequency.
Please perform checkpoints in the following order.
a) Press the measurement switch and turn off the power after about 10 seconds. At this time, the weight stops at a position of 1.5 m.
b) Remove the weight and cable from the working port.
c) Remove the split pin of the cable fixing rod and remove the fixing rod to check the state of the bent part.
d) Use your finger to push the detection lever up and down to confirm normal rotation. If there is resistance to rotation, please clean it to make it rotate normally.
Note: There is no need to refuel the shaft portion and the rotating pulley portion of the detection lever. If lubricating oil or mechanical oil is added, it is easy to adhere to dust and other malfunctions.
e) Use your finger to turn the pulley to confirm that it is rotating normally. If there is resistance to rotation, it is necessary to replace the bearing of the pulley. Lubrication Maintenance The heavy hammer level gauge does not require lubrication.
For the replacement of the cable, replace the cable in the following order.
a) Remove the outer and outer casings of the weight level gauge.
b) Press the measurement switch and turn off the power after 2 to 3 seconds. At this time, please confirm whether the weight has dropped by more than 0.3m.
Note: When the cable is broken, do not press the measuring switch to cut off the power directly.
c) Remove the wiring cable connected to the weight level gauge terminal. At this time, the 1, 2, 3, 4, 5, r, and t symbols are attached to the end of the cable to distinguish the core wires of the cable.
d) Remove the ground wiring from the side.
e) Remove the mounting bolts from the flange.
f) Remove the heavy hammer level gauge with the cable drum facing up and horizontally.
g) Cut the cable near the fixed cable.
h) Remove the fixing bolts, washers, wire ends and split pins of the cable drum.
i) Pull out the cable reel upwards.
j) Cut off the end of the cable and take out the cable.
k) Pass the new cable through the hole in the cable drum and use the 5mm terminal for tail end treatment. At this time, the open end of the cable forms a ring shape.
l) The terminal mounting port and the shaft of the cable reel maintain a certain margin, and the cable is wound onto the cable reel. At this time, please be careful not to have a strong rope. Turn the cable reel around the wire by hand so that the cable will not be strong.
m) Insert the cable reel onto the spool shaft according to the position of the keyway. At this time, the end of the opposite side of the cable is held from the flange to maintain a margin of 1 to 2 m. That is, after installation, the weight is lowered to a position of 1 to 2 m.
n) Pass the cable from the pulley side through the rectangular lead hole of the detection lever up to the outside of the flange.
o) Remove the cable fixing rod and remove the pin.
p) The cable is passed through the cable fixing rod and the first end is fixed with a 4mm crimping terminal.
q) Install the crimp terminal and the connecting chain on the cable fixing rod.
r) Put the scale hammer into the silo and install the heavy hammer level gauge. At this time, please be careful not to damage the cable.
s) Check if the cable is coming off the pulley. If it falls off, the handle is inserted from the checkpoint, and the weight of the hammer is pulled up and the wire is hung into the pulley groove.
t) Restore the ground wire and cable connections.
u) If the power switch is turned ON, the weight will rise to the standby position, and press the measurement switch to confirm the measurement status.
v) Repeat the measurement for 2 to 3 times. If there is no abnormality, install the outer and outer casings and tighten the bolts to complete the work.
Huajiang Automation can provide you with the most professional heavy-duty material level selection suggestions and the most reliable instrument products. If you have any questions, we will have professional technicians to help you answer them. I hope to help you!
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

When Car Reflective Vest  use the aluminum lattice reflective material, not only in a small angle (from the reflective warning vest wearer far away), reflective brightness is high, even at a large angle (from the reflective warning vest wearer closer ), it still has a good reflective brightness, so that the locomotive driver earlier identified roadside vehicle side of the staff, as soon as possible to respond to effectively prevent the occurrence of secondary accidents.

Reflective warning vests are made of high-visibility reflective material It can make the traffic police work smoothly in the night or special weather in order to reduce the rate of the casualties. it plays a special role in security especially in traffic engineering.When the motor vehicle fails, the driver needs to wear a reflective warning vest, and away from the faulty vehicle to prevent the occurrence of secondary accidents. This kind of reflective warning vest is mainly applicable to police, road officials, traffic commanders, road maintenance personnel, motorists, motorcycles and bicycles drivers, dark light workers and so on in one word,  the local worker who needs to use light warning. Widely used in traffic engineering, shipbuilding industry, steel industry, machinery industry, oil industry, ambulance, parking lot, airport, traffic police and outdoor work or construction, plays an important role in  good security warning  .

According to reflective vest`s wearing [far distance discovers, near distance recognise" s character. It balances the big and small angle of optical performance. It has a large reflection angle.

Reflective warning`s reflection part of the vest is the use of lattice micro-rhombus type refraction and high refractive index of glass beads back to the principle of reflection, through the post-processing of advanced processing technology made. It can reflect the distant light back to the light. Both in the day or night have a good retroreflective optical performance. Especially at night, it can play the same high visibility as the day. The use of this high-energy reflective material made of safety clothing, whether the wearer is in the distance, or in the light or scattered light interference, it can be relatively easy to be found by the night driver.

Reflective safety parka

Kids Reflective Garments,High Visibility Kids Reflective Garments,Kids Safety Reflective Garment,Reflective Safety Visibility Kids Vest

Daoming Optics & Chemical Co., Ltd , https://www.reflectives.nl