How to install the bathroom integrated ceiling Yuba?

Speaking of integrated ceiling Yuba, everyone is familiar with it, especially after the fall, one day is cold, one day, even taking a bath is a troublesome thing. Therefore, it is necessary to install a Yuba in the bathroom. Yuba is very convenient to use. No matter how cold the day will make your bathing process warm and comfortable, if you have the need to purchase integrated ceiling Yuba, you may want to know more about it. Here are some questions about how to install Yuba in the integrated ceiling , let's take a look at the Xiaobian of the decoration home network!


集成吊顶如何安装浴霸


First, integrated ceiling Yuba installation steps

1, the installation of the corner line

The installation strip should be installed flat and firm, determine the installation height, and draw a horizontal line. After the tiles are properly placed, in the horizontal situation, the matching corner lines of the ceiling are integrated and tightly fixed on the tiles, so that there is no obvious gap.


2, the installation of the keel

The lower boom and the light steel keel are placed, and the distance between the boom and the keel is the same as the panel size. Open the expansion eye at the top and fix all the booms. Connect the lower bottom of the boom to the hook. Then fix the main dragon skeleton in the middle of the hook and adjust the height nut so that the plane of the main keel is 3cm away from the plane line on the edge strip. And fastened.


3, the installation of the keel

According to the actual installation length minus 5mm, take the required keel, put on the triangular hanging piece, and temporarily suspend all the keel with the triangular hanging piece on the main keel according to the drawings.


4, the installation of the gusset

Wear clean gloves and install the gussets to take into account the overall aesthetics and bilateral symmetry.

Cutting method: Fix the template, use the utility knife and ruler to describe it more than three times, cut the edge with a scissors to cut it into a 90 degree angle, and fold it by hand 2-3 times. The corresponding surface of the template cutting opening is stuck in the keel, the cutting surface is placed on the edge strip, and the edge strip is pulled out to clamp the template. At this time, the triangular lifting piece can be clamped with the steel tongs and the main keel. . When the middle part template is installed, the two corresponding faces of the template are respectively stuck in the keel, and the gap between the templates is controlled to maintain the straight line of the seam.


Note: After completing the installation of each row of templates, the triangular lifting pieces should be clamped with the steel tongs and the main keel.


5, the installation of the host

When designing the installation position of the heating type host according to the drawing, replace the template with the main panel to confirm the accurate installation position of the main unit; then place the main unit on the top of the keel. Install (embed) the electrical appliance, and make the panel and electrical interface flat and seamless.


6, the top line and mouth panel

At the top of the line, determine where to install the luminaire, where to install the kitchen and bathroom appliances, and arrange the line in advance. Buckle panel, this link is directly related to the overall effect of the ceiling. Not only should it be leveled, but it should be straight.


Xiao Bian reminds: the correct installation order in the bathroom is to install the Yuba, exhaust fan, and then do the ceiling. Do not install the exhaust fan or Yuba directly on the aluminum plate, and use the expansion bolts to hang directly on the concrete on the top.


集成吊顶如何安装浴霸


Second, the integrated ceiling Yuba installed accessories

The accessories installed in the integrated ceiling Yuba mainly include: full wire hanging bar, main keel (light steel keel), main keel hook (38 hanging piece), main keel joint, Fu keel, Fu keel joint (triangle joint), triangle hanging piece , edge strips (punched bevel, bright lines).


Third, the preparation of the integrated ceiling Yuba installation

1, equipped with tools

Electric drill, adjustable speed electric hammer, cutting machine or polishing machine; square, tape measure, level ruler; multimeter, utility knife, wire cutter.


2, spare materials

Steel nails, ordinary nails, wood screws; insulating tape, gloves; wood.


3, measurement

Confirm the exact installation dimensions; the specific size and location of the house and various structures; the installation height of the ceiling; the installation position and orientation of the mainframe; the matching scheme of the template and the confirmation of the host.


The above is all the contents of Xiaobian for you to install the Yuba on the integrated ceiling. I believe that after reading this article, the small masters have a basic understanding of how to install the Yuba in the integrated ceiling. If you want to know more about decoration consultation, Please click to enter the decoration process section.


Real-time data access for underground mines has traditionally been a challenge. The lack of broadband network connection and the nature of the environment has led to some of these challenges.
We understand that the benefits of implementing a reliable and scalable wireless network in underground mines are huge not only for personnel safety but to remain competitive through optimized production and maintenance cost reduction.


Mine Wireless Wifi

Mine Wireless Wifi,Mine Wifi System,Wireless Wifi Communication,Mine Wifi Communication System

Jinzhou Jinshi Mining Equipment Technology Co., Ltd. , https://www.jsminingeqpt.com