Different sizes of floor tiles are used for decoration. Different home styles are preferred, and different paving methods are used. The difference in the way of paving leads to a great difference in the final decoration effect. Different paving methods can reflect different home styles. Consumers can choose the most suitable paving method for their own, get satisfactory results, and also show their own personality.

For bathroom tiling, whether it is material selection, preparation before construction, details during construction, or inspection and maintenance after construction, each construction link is very particular. This time, Xiao Bian asked Wang Shifu, who has 10 years of tiling experience, to pay attention to some bathroom bricks.

Part1: Purchase of materials - attention should be paid to the size of the lighting

Master Wang said that many owners only choose sanitary tiles according to their own preferences. In fact, the purchase of bathroom tiles needs to be selected according to the lighting, size and humidity of the bathroom. When purchasing, you need to see the quality, size and radiological health certificate of the materials.

When buying glazed tiles, pay attention to the size of the bricks according to the size of the bathroom. The size of glazed tiles can be divided into square and rectangular, square glazed tiles 100×100 mm, 152×152mm, 200×200mm, rectangular glazed tiles are 152×200mm, 200×300mm, 250×330mm, 300×450mm, etc., thickness is 5mm -8mm.

In addition, Master Wang specially reminded Xiaobian that when buying ceramic tiles, it is necessary to pay attention to: observe the appearance color, uniform color, good surface gloss and flatness, especially polished tiles; tile anti-pollution ability is good, can be tested by drop of ink; Can not be deformed, put together four bricks, if the regularity is not wrong, it meets the requirements; the tiles should not have obvious warpage.

Part2: Preparation before construction - material handling should be done properly

The so-called "three armed forces have not moved, grain and grass first", to do a good job, must be prepared in advance. Pre-construction preparation requires attention to material preparation and tool preparation.

Xiaobian curiously looked at the large pot of tiles on the balcony. According to Master Wang’s explanation, when the tiles were laid, the fit of the tiles to the walls was greater than the gravity generated by them. Because the tile itself has many small holes, the water absorption capacity is strong, and the dry tile will absorb the moisture of the cement, so that the fitting degree is lowered, and the drum is easy to appear and fall off after the laying. Therefore, the tiles must be soaked for 24 hours until no bubbles appear, then dried and then laid.

Master Wang, who is experienced, said that before the renovation, some households laid the tiles without shovel the putty. As a result, the cement could not be hanged and the tiles fell off. Therefore, before laying the bricks, Master Wang carefully checked the wall and shoveled the putty on the wall, so that the bricks were very secure.

Part3: Details in construction – need to be cautious for even paving

The paving process is very important, directly affecting the paving effect of the bathroom brick surface. In the process of seeing Master Wang paving the bricks, there are many small details that need attention.

When the tiles are laid, the humidity of the cement mortar should be well grasped. Too dry or too wet will affect the adhesion between the tile and the wall. The cement mortar needs to be evenly and satisfactorily applied to the back of the tile to avoid smearing it all around. After the tile is attached to the wall, it needs to be hammered with a rubber hammer. At the same time, the tile should be inspected and the cement should be added or reduced in time. This process needs to be repeated until the tile and the wall are evenly fitted.

Due to the newly laid tiles, the cement is not completely dried and is easily sunk by gravity. Therefore, after the tile is attached to the wall, a certain gap must be reserved between the upper and lower tiles. If the retained gap is too small, it is easy to crack the glaze when the heat is expanded and contracted, reducing the service life of the tile.

When the tiles are laid, the tiles are dried and then caulked. If the tile is not completely dry, it will fill the seam, which will easily cause the tile to loosen and cause the tile to fall off, which will leave hidden dangers.

When paving non-whole bricks, first measure the size of the vacant position, determine the brick-laying method according to the number of tiles and the texture of the brick surface, and then cut the tile. For some tiles whose texture is not obvious, such as micro-powder bricks, pay attention to the directionality when laying them, so as not to make the walls messy.

Part4: Pay attention after construction - check and maintain should not be ignored

After the tile is laid, the maintenance of the tiles is also an important part of the construction. Protect yourself from the damage of the brick surface before use.

After 1 hour of tile tiling, use a towel to clean the brick surface of cement, caulking and other stains. Do not use a steel ball to clean afterwards, which will easily damage the brick surface.

After the tiles are laid, some follow-up works will be carried out. In order to avoid scratching the tiles during the construction, the tiled tiles must be protected after the wall coverings are completed. The box can be placed on the tile below the wall, avoiding the brick surface when moving the bathroom utensils and construction tools.

After the paving is completed for 12 hours, the flatness and verticality of the wall surface can be checked with a level gauge, and the tile is hit with a rubber hammer to check the empty drum condition of the brick, and it is found that the empty drum should be reworked immediately. [Follow the WeChat public number "Jiuzheng Ceramics Network" ; pay attention to surprises, scan the code to read "I am selling tiles..." Jiuzheng Ceramics Network Exchange Group: 80123558 】

Magnetic switch is used to probe the door, window and drawer if opened illegally or mobile. It is composed of two parts: a wireless transmitter and a magnetic block.The magnet and the dry reed pipe are respectively arranged in the door frame (window frame) and the door leaf (window sash), which are basically embedded and installed.Magnetic switch including Door magnetic switch and Wordrobe Magnetic switch. Door magnetic switch: The preinstall Gallery lights will turn on while open door. Wordrobe  Magnetic switch: The wordrobe light will turn on while open wardrobe.


Door magnetic switch

Door Magnetic Switch


Wordrobe Magnetic switch

Wordrobe Magnetic Switch

Smart Hotel Magnetic Switch

Smart Hotel Magnetic Switch,Open Door Contact Switch Magnetic,Magnetic Door Contact Switch

Shenzhen Zhuohao Intelligent Electronic Development Co., Ltd. , https://www.szactop-smart.com